Project Management · Tisch — Wing B
Requests for Information
BID-1247 · FW #31247
Every field question on the millwork package — blocking, field dimensions, finish profiles, Blum hardware — on the record from ask to answer, routed through Hunter Roberts to Studio Marek Architecture.
Open
1
Answered
4
Overdue
0
Avg days to answer
8
Ball in court · 2 unanswered
Awaiting an answer
Unanswered questions hold shop tickets — chase these first.
Reception Desk — Power/Data Grommet Locations Conflict
Electrical drawing E-201 grommet locations at the main reception desk land within the drawer bank shown on SUB-007. Request revised grommet locations or confirmation to shift drawer bank 6" north.
required Jun 12, 2026 · due tomorrow
Fire-Rating Requirement — Trim Within Stair B Enclosure
Confirm whether standing-and-running trim within the Stair B enclosure (2-hr rated) must be fire-treated material or may be field-finished poplar with intumescent coating per spec 06 22 13 alternates.
not issued · required Jun 25, 2026 · due in 14 days
Register · 6 on the log
RFI log
Unanswered items lead; answered follow in numeric order. Select any subject for the full question, the answer on record, and the sheets it cites.
| RFI | Subject | Status | Asked by | Answered by | Asked | Answered |
|---|---|---|---|---|---|---|
| RFI-005 | Open | Marco DelgadoEllicorp | — with Architect | May 28, 2026 | due Jun 12, 2026 | |
| RFI-006 | Draft | Marco DelgadoEllicorp | — with Ellicorp | not issued | due Jun 25, 2026 | |
| RFI-001 | Answered | Marco DelgadoEllicorp | Avery LinStudio Marek Architecture | Feb 23, 2026 | Mar 03, 2026 | |
| RFI-002 | Answered | Marco DelgadoEllicorp | Avery LinStudio Marek Architecture | Mar 09, 2026 | Mar 17, 2026 | |
| RFI-003 | Answered | Marco DelgadoEllicorp | Avery LinStudio Marek Architecture | Mar 23, 2026 | Apr 01, 2026 | |
| RFI-004 | Answered | Marco DelgadoEllicorp | Dana PierceHunter Roberts Construction Group | Apr 13, 2026 | Apr 20, 2026 |
- RFI
- RFI-005
- Status
- Open
- Answered by
- — with Architect
- Asked
- May 28, 2026
- Answered
- due Jun 12, 2026
- RFI
- RFI-006
- Status
- Draft
- Answered by
- — with Ellicorp
- Asked
- not issued
- Answered
- due Jun 25, 2026
- RFI
- RFI-001
- Status
- Answered
- Answered by
- Avery LinStudio Marek Architecture
- Asked
- Feb 23, 2026
- Answered
- Mar 03, 2026
- RFI
- RFI-002
- Status
- Answered
- Answered by
- Avery LinStudio Marek Architecture
- Asked
- Mar 09, 2026
- Answered
- Mar 17, 2026
- RFI
- RFI-003
- Status
- Answered
- Answered by
- Avery LinStudio Marek Architecture
- Asked
- Mar 23, 2026
- Answered
- Apr 01, 2026
- RFI
- RFI-004
- Status
- Answered
- Answered by
- Dana PierceHunter Roberts Construction Group
- Asked
- Apr 13, 2026
- Answered
- Apr 20, 2026
How this connects
Data flows from Fieldwire job #31247 (Tasks, Sheet markups, Photos) through the Fieldwire bridge into the RFI Workflow skill, which produces RFI log (.xlsx) + RFI forms (.pdf).
Demo data — field questions start life as Fieldwire tasks. The bridge carries each task, its sheet markups, and photos into the RFI Workflow skill, which drafts the form and keeps the log current. Automation ships in the integration phase.